Route (Hwy or Interstate) | Description | Begin Date | End Date | 2021 Construction Cost | Total Construction Cost | MnDOT District | Website |
1 | Complete roundabout at Hwy 1 and Hwy 59 | 6/2021 | 10/2021 | $1,657,000 | $9,904,000 | 1 | mndot.gov/d2/projects/2020/hwy1-roundabouts |
1 | Resurface Hwy 1 from Hwy 65 to Hwy 53, and Hwy 73 from Hwy 1 to Hwy 53; repair bridge | 5/2021 | 7/2021 | $4,100,000 | $8,200,000 | 1 | mndot.gov/d1/projects/hwy1resurfacing |
1 | Resurface Hwy 1 between Hwy 219 and Pennington CR 18 in Thief River Falls | 8/2020 | 5/2021 | $845,000 | $6,782,000 | 2 | mndot.gov/d2/projects/2020/hwy1-resurface |
2 | Resurface Hwy 2 from .4 miles E of Prairie River to 1.97 miles E of Hwy 65 | 7/2021 | 11/2021 | $13,900,000 | $13,900,000 | 1 | mndot.gov/d1/projects/hwy2-reclaim |
2 | Access management improvements on Hwy 2 between Wilton and Beltrami CR 9 in Bemidji | 5/2021 | 8/2021 | $2,890,000 | $2,890,000 | 2 | mndot.gov/d2/projects/hwy2-bemidji |
2 | Construct multi-use trail along Hwy 2 between Cass CR 91 and Old Housing Rd near Bena | 11/2021 | 11/2022 | $2,935,000 | $2,935,000 | 2 | mndot.gov/d2/projects/hwy-2 |
2 | Construct pedestrian/bike trail along north side of Hwy 2 between Cass CR 75 and Cemetery Rd west of Cass Lake | 7/2021 | 11/2021 | $740,000 | $740,000 | 2 | mndot.gov/d2/projects/hwy2-trail |
2 | Replace concrete roadway on Hwy 2 eastbound lanes from Hwy 32 (Marcoux) to 1.8 miles west of Erskine, install RCI at Marcoux corner | 5/2021 | 10/2021 | $23,849,000 | $23,849,000 | 2 | N/A |
2 | Resurface Hwy 2 east of Hubbard CR 46 to Hwy 371 in Cass Lake | 7/2021 | 9/2021 | $3,270,000 | $3,270,000 | 2 | mndot.gov/d2/projects/hwy2-resurface |
2 | Resurface Hwy 2 eastbound lanes from east of Hwy 9 to west of Hwy 32 | 9/2021 | 10/2021 | $2,200,000 | $2,200,000 | 2 | mndot.gov/d2/projects/hwy2-resurfacing |
2 | Resurface Hwy 2 from Cass CR 206 to Cass CR 10 east of Cass Lake | 7/2021 | 8/2021 | $2,220,000 | $2,220,000 | 2 | mndot.gov/d2/projects/hwy2-casslake |
2 | Resurface Hwy 2 westbound lanes from East Grand Forks to Fisher | 7/2021 | 10/2021 | $10,760,000 | $10,760,000 | 2 | mndot.gov/d2/projects/2021/hwy2b-egf |
4 | Reconstruct Hwy 4 from 2nd Ave S to 2nd Ave N and update sidewalks in Meire Grove | 7/2021 | 10/2021 | $2,955,000 | $2,955,000 | 3 | mndot.gov/d3/projects/meiregrove |
5 | Repair Hwy 5/E 7th St Bridge and replace sidewalk over the BNSF and CP rail line southwest of Hwy 61 in St Paul | 5/2021 | 8/2021 | $770,000 | $770,000 | Metro | N/A |
6 | Resurface 10 miles of Hwy 6 from Cass/Itasca county line to Hwy 2 west of Cohasset; replace pipes and realign CR 11 access | 5/2021 | 7/2021 | $2,868,000 | $2,868,000 | 3 | mndot.gov/d3/projects/2021/h6 |
6 | Update Hwy 6 railroad signal system near Hwy 2 west of Cohasset | 8/2021 | 9/2021 | $255,000 | $255,000 | 3 | N/A |
7 | Install overhead street lighting at Hwy 7/CR 15 intersection | 7/2021 | 9/2021 | $30,000 | $30,000 | 8 | N/A |
7 | Upgrade sidewalk to a multiuse trail along Hwy 15 from Grove St to Linden Ave, and install sidewalk on the north side of Hwy 7 from 5th Ave to Garden Rd NE | 7/2021 | 9/2021 | $370,000 | $390,000 | 8 | N/A |
7 | Construct dual left-turn lanes at Hwy 7 and Hopkins Crossroad in Hopkins/Minnetonka | 6/2021 | 8/2021 | $2,056,080 | $2,056,080 | Metro | mndot.gov/metro/projects/hwy7hopkinscrd |
7 | Resurface and preventative maintenance on Hwy 169, Hwy 12, and Hwy 7 - in Metro District | 5/2018 | 6/2021 | $1,200,000 | $1,820,000 | Metro | N/A |
7 | Resurface Hwy 7 and repair drainage on Hwy 7 from .07 miles west of Christmas Lake Rd in Excelsior to 0.1 miles east on I-494 in Minnetonka | 8/2021 | 11/2021 | $6,949,000 | $6,949,000 | Metro | mndot.gov/metro/projects/hwy7minnetonka-shorewood |
8 | Construct dedicated left-turn lane for EB Hwy 8 at Deer Garden Ln in Chisago City | 4/2021 | 7/2021 | $614,000 | $614,000 | Metro | mndot.gov/metro/projects/hwy8chisago |
8 | Install fiber-optic cable and cameras on Hwy 8 from I-35 in Forest Lake to Akerson St in Lindstrom | 9/2020 | 7/2021 | $705,100 | $938,000 | Metro | N/A |
9 | Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau | 5/2021 | 9/2021 | $2,011,000 | $2,011,000 | 2 | mndot.gov/d2/projects/bridges |
10 | Install median cable barrier guardrail on Hwy 10 from CR 40 north of Rice to 66th St north of Sauk Rapids | 5/2021 | 6/2021 | $1,435,000 | $1,435,000 | 3 | mndot.gov/trafficeng/reports/cmbarrier.html |
10 | Reconstruct Hwy 10 from Simonet Dr to Lowell Ave in Elk River, add multi-use trail, improve access at Proctor Ave | 4/2021 | 10/2021 | $9,618,000 | $9,618,000 | 3 | mndot.gov/d3/projects/h10elkriver |
10 | Construct MnPASS lane; resurface road; repair 17 bridges; replace 5 bridges on I-35W from CR B2 in Roseville to 0.1 mile north of Sunset Ave in Lino Lakes, and on Hwy 10 from Jct with I-35W to 0.7 miles east of County Rd J | 4/2019 | 9/2021 | $38,173,000 | $200,675,000 | Metro | mndot.gov/metro/projects/35wnorthmnpass |
10 | Districtwide resurfacing, maintenance and repairs on various roads - Metro District | 5/2019 | 2/2022 | $2,500,000 | $7,500,000 | Metro | N/A |
10 | Replace signal systems; update ADA to to meet current accessibility standards; add new sidewalk; reconstruct northeast loop ramp; make bridge revisions on Hwy 10 between north and south ramps at Round Lake Blvd in Coon Rapids | 6/2021 | 7/2021 | $1,818,000 | $1,818,000 | Metro | mndot.gov/metro/projects/hwy10coonrapids |
11 | Replace signs on Hwy 11 in International Falls from 2nd Ave to CR 140 | 4/2021 | 11/2021 | $237,000 | $237,000 | 1 | N/A |
11 | Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau | 5/2021 | 9/2021 | $2,011,000 | $2,011,000 | 2 | mndot.gov/d2/projects/bridges |
12 | Resurface Hwy 12 and widen shoulders from Hwy 75 in Ortonville to Hwy 59, includes culvert replacements, bridge improvements and snow trap improvements | 5/2021 | 11/2021 | $23,700,000 | $23,700,000 | 4 | mndot.gov/d4/projects/hwy12 |
12 | Realign Hwy 12 and reconstruct Hwy 40 to facilitate a new railroad line on the west side of Willmar | 5/2019 | 11/2021 | $10,500,000 | $17,500,000 | 8 | mndot.gov/d8/projects/willmarwye |
12 | Resurface 1.3 miles of Hwy 12 from 6th St SE to 24th St SE in Willmar | 7/2021 | 11/2021 | $700,000 | $700,000 | 8 | mndot.gov/d8/projects/hwy12willmar |
12 | Resurface 3.4 miles of Hwy 12 from CR 1 in Pennock to just east of CR 5 in Willmar | 8/2021 | 9/2021 | $890,000 | $890,000 | 8 | mndot.gov/d8/projects/hwy12 |
12 | Construct a wider roadway with a 10-foot buffer and median barrier on Hwy 12 from CR 6 to CR 29 in Maple Plain | 5/2021 | 11/2021 | $4,859,000 | $4,859,000 | Metro | mndot.gov/metro/projects/hwy12-orono-independence |
12 | Construct roundabout at Hwy 12 and CR 90 in Independence | 5/2021 | 11/2021 | $4,364,000 | $4,364,000 | Metro | mndot.gov/metro/projects/hwy12-orono-independence |
12 | Resurface and preventative maintenance on Hwy 169, Hwy 12, and Hwy 7 - in Metro District | 5/2018 | 6/2021 | $1,200,000 | $1,820,000 | Metro | N/A |
13 | Replace signal system at Hwy 13/7th Ave NW in Waseca | 5/2021 | 11/2021 | $360,000 | $360,000 | 7 | N/A |
14 | Construct a new 4-lane alignment of Hwy 14 from Steele CR 43 to Hwy 56 N | 10/2019 | 8/2022 | $63,000,000 | $105,956,000 | 6 | mndot.gov/d6/projects/hwy14 |
14 | Install cable median barrier along Hwy 14 from Byron to Rochester | 8/2021 | 11/2021 | $1,130,000 | $1,130,000 | 6 | N/A |
14 | Install cable median barrier on Hwy 14 from I-35 to Steele CR 43 | 5/2021 | 10/2021 | $810,000 | $810,000 | 6 | N/A |
14 | Install culvert linings and improve drainage on Hwy 14 from Olmsted CR 9 to Olmsted CR 5 | 7/2021 | 9/2021 | $490,000 | $490,000 | 6 | N/A |
14 | Install traffic management equipment on Hwy 14 from Olmsted CR 5 in Byron to West Circle Dr in Rochester | 7/2020 | 6/2021 | $529,000 | $671,000 | 6 | N/A |
14 | Construct two roundabouts at the Hwy 14 and CR 57/Riverfront Drive interchange; improve pedestrian crossing and trail, reconstruct pavement beneath Hwy 14 bridge, install lighting. Partnership project with city of Mankato; cost shown does not include city and county portions of funding | 5/2021 | 10/2021 | $1,326,000 | $1,326,000 | 7 | mndot.gov/d7/projects/hwy14riverfrontdrive |
14 | Landscaping along Hwy 14 from Burnett Lane to Peregine Lane in North Mankato | 4/2021 | 10/2021 | $10,000 | $10,000 | 7 | N/A |
14 | Replace Hwy 14 signal system on Hwy 14/15 at 16th North St and improve pedestrian crossing; at 19th South St in New Ulm improve pedestrian crossing; at 1700 South Broadway St replace sidewalk; at DNR entrance add lighting | 5/2021 | 11/2021 | $420,000 | $420,000 | 7 | N/A |
14 | Repair erosion and stabilize slope on Hwy 14 near Lake Yankton in Balaton | 5/2021 | 6/2021 | $50,000 | $50,000 | 8 | N/A |
15 | Upgrade sidewalk to a multiuse trail along Hwy 15 from Grove St to Linden Ave, and install sidewalk on the north side of Hwy 7 from 5th Ave to Garden Rd NE | 7/2021 | 9/2021 | $370,000 | $390,000 | 8 | N/A |
19 | Landscape along Hwy 19 from Fort Road to South 6th Street in Henderson | 4/2021 | 10/2021 | $8,000 | $8,000 | 7 | N/A |
19 | Reconstruct Hwy 19 in New Prague from Hwy 21 to 7th Ave SE; replace underground utilities, sidewalk, lighting and landscaping; resurface Hwy 19 from 5th Ave NW to Hwy 21 | 4/2020 | 10/2021 | $13,331,000 | $13,431,000 | 7 | mndot.gov/d7/projects/hwy19newprague |
19 | Repair drainage and create pond on Hwy 19, 1 mile east of Morton | 5/2021 | 6/2021 | $772,000 | $772,000 | 8 | mndot.gov/d8/projects/hwy19drainagerepair |
19 | Repair drainage and stabilize slopes 2.8 miles east of Morton | 4/2020 | 6/2021 | $49,000 | $392,000 | 8 | mndot.gov/d8/projects/hwy19sloperepair |
21 | Resurface Hwy 21 from 1.07 miles west of I-35 to Hwy 99 in Rice County | 4/2021 | 6/2021 | $3,640,000 | $3,640,000 | 6 | mndot.gov/d6/projects/hwy21-resurfacing-shieldsville |
23 | Construct new road connection in Duluth - 134th Ave W from Hwy 23 to 4th St | 9/2021 | 11/2021 | $2,100,000 | $2,100,000 | 1 | mndot.gov/d1/projects/hwy23roadconnection |
23 | Landscaping - Mission Creek Cemetery on Hwy 23 in Duluth | 8/2021 | 11/2021 | $230,000 | $230,000 | 1 | mndot.gov/d1/projects/hwy23-mission-creek |
25 | Resurface Hwy 25; update ADA to to meet current accessibility standards; repair drainage from Hwy 5 to CR 30/1st St in Mayer | 5/2021 | 7/2021 | $1,200,000 | $1,200,000 | Metro | mndot.gov/metro/projects/hwy25-mayer-nya |
25 | Resurface Hwy 25; add right turn lane; improve sidewalk accessibility, trail extension and drainage from 0.1 miles south of CR 30 in 05/er to State St in Watertown | 8/2020 | 6/2021 | $3,705,000 | $7,599,000 | Metro | mndot.gov/metro/projects/hwy25mayer |
27 | Resurface Hwy 27 from Hwy 65 to Aitkin/Carlton County Line | 7/2021 | 9/2021 | $6,623,000 | $6,623,000 | 1 | mndot.gov/d1/projects/hwy27 |
29 | Construct Hwy 29 overpass in Glenwood, includes new bridge, resurfacing and roundabouts | 7/2021 | 11/ 2022 | $2,325,000 | $9,300,000 | 4 | mndot.gov/d4/projects/glenwoodoverpass |
30 | Resurface Hwy 30 west of Ellendale to Steele CR 45. Realign intersection of Hwy 30 and E 8th Ave. Improve culverts and accessibility | 7/2021 | 10/2021 | $2,600,000 | $2,600,000 | 6 | mndot.gov/d6/projects/hwy30-ellendale |
32 | Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau | 5/2021 | 9/2021 | $2,011,000 | $2,011,000 | 2 | mndot.gov/d2/projects/bridges |
36 | Repair culverts in various locations between I-35E in Little Canada and Stillwater Blvd in Stillwater | 5/2021 | 6/2021 | $654,000 | $654,000 | Metro | N/A |
37 | Resurface Hwy 37 in Gilbert from Hwy 53 to Hwy 135 | 7/2020 | 10/2021 | $3,224,000 | $6,310,000 | 1 | mndot.gov/d1/projects/hwy37-gilbert |
40 | Replace 3 metal culverts with concrete box culverts along Hwy 40 in Kandiyohi and Chippewa counties | 5/2021 | 11/2021 | $1,400,000 | $1,400,000 | 8 | mndot.gov/d8/projects/hwy40 |
40 | Replace bridge on Hwy 40 (known as Milan bridge) over Lac qui parle Lake west of Milan | 4/2019 | 4/2021 | $450,000 | $7,700,000 | 8 | mndot.gov/d8/projects/hwy40-bridge-milan |
47 | Resurface, repair drainage, update ADA to to meet current accessibility standards on Hwy 47 from Pleasant St to Coolidge St in Anoka, and on Hwy 169 from the south end of the Mississippi River bridge to Clay St in Anoka | 7/2021 | 10/2021 | $2,181,000 | $2,181,000 | Metro | mndot.gov/metro/projects/hwy47-169-anoka |
51 | Replace signal; update ADA to to meet current accessibility standards on Hwy 51 at Roselawn Ave in Falcon Heights and CR C2 in Roseville | 4/2021 | 7/2021 | $891,000 | $891,000 | Metro | N/A |
52 | Reconstruct Hwy 52 SB lanes near Hwy 19 to near Hwy 60. Construct new interchange and bridge at Hwy 52/Hwy 57 intersection at Hader. Replace Hwy 60 bridges | 5/2021 | 10/2023 | $12,000,000 | $69,700,000 | 6 | mndot.gov/d6/projects/hwy52-hader-southbound-improvements |
52 | Replace lighting on Hwy 52 at upper 55th St, 70th St and 80th St in Inver Grove Heights | 2/2021 | 8/2021 | $377,000 | $377,000 | Metro | N/A |
52 | Resurface and repair concrete on Hwy 52 from Hwy 52/I-494 interchange in Inver Grove Heights to Plato Blvd in St Paul; improve weight enforcement facility, pedestrian crossing and signing | 4/2021 | 10/2021 | $11,028,000 | $11,028,000 | Metro | mndot.gov/metro/projects/hwy52-stpaul-invergrovehts |
52 | Resurface, repair drainage, update signals and bridge joints on Hwy 52 from the North end of the Cannon River to CR 86 in Randolph Twp | 9/2020 | 10/2021 | $6,207,000 | $7,216,000 | Metro | mndot.gov/metro/projects/hwy52hampton-cannonfalls |
53 | Reconstruct Hwy 53 from Crescent Dr to 4th St, and Hwy 11 from Hwy 71 to Hwy 53 in International Falls | 7/2020 | 10/2021 | $13,307,000 | $18,500,000 | 1 | mndot.gov/d1/projects/hwy-53-international-falls |
53 | Install cable guardrail on Hwy 53 between Eveleth and Virginia | 5/2021 | 8/2021 | $592,000 | $592,000 | 1 | N/A |
53 | Resurface southbound Hwy 53 from CR 13 to CR 8 | 5/2021 | 11/2021 | $10,420,000 | $10,420,000 | 1 | mndot.gov/d1/projects/hwy53-pike-lake |
53 | Safety improvements at the intersections of Hwy 53/CR 95 and Hwy 53/CR 132 | 7/2021 | 11/2021 | $650,000 | $650,000 | 1 | mndot.gov/d1/projects/hwy-53-intersections |
53 | Twin Ports Interchange construction and bridge replacement at I-35, I-535 and Hwy 53 in Duluth | 10/2020 | 11/2023 | $127,000,000 | $275,840,000 | 1 | mndot.gov/d1/projects/twin-ports-interchange |
55 | Reconstruct Hwy 55 road, storm sewer and sidewalks from School Ave to Railway Ave in Brooten and from Stearns CR 19 to Borgerding Ave in Belgrade | 4/2021 | 8/2021 | $2,938,000 | $2,938,000 | 3 | mndot.gov/d3/projects/h55stearns |
55 | Construct Hwy 29 overpass in Glenwood, includes new bridge, resurfacing and roundabouts | 7/2021 | 11/ 2022 | $2,325,000 | $9,300,000 | 4 | mndot.gov/d4/projects/glenwoodoverpass |
55 | Resurface Hwy 55 from .1 miles east of General Mills Blvd to .2 miles west of Hwy 100 in Golden Valley; repair drainage; build bike/ped trail, update ADA to to meet current accessibility standards; add guardrail | 7/2021 | 10/2021 | $3,280,000 | $3,280,000 | Metro | mndot.gov/metro/projects/hwy55goldenvalley |
58 | Resurface Hwy 58 from 0.15 miles north of 21st St to Hwy 61 in Red Wing | 7/2021 | 10/2021 | $1,270,000 | $1,270,000 | 6 | mndot.gov/d6/projects/hwy58-resurfacing |
59 | Complete roundabout at Hwy 1 and Hwy 59 | 6/2021 | 10/2021 | $1,657,000 | $9,904,000 | 1 | mndot.gov/d2/projects/2020/hwy1-roundabouts |
59 | Resurface Hwy 59 from Winger to Erskine and improve pedestrian crossings in Winger | 5/2021 | 7/2021 | $2,640,000 | $2,640,000 | 2 | mndot.gov/d2/projects/hwy59-winger |
59 | Repair Hwy 59 from Hwy 30 to Hwy 14, and from Lyon CR 6 to Hwy 23 in Marshall | 7/2021 | 11/2021 | $2,160,000 | $2,160,000 | 8 | mndot.gov/d8/projects/hwy59marshall |
60 | Replace expansion joints and paint Hwy 60 bridge in Wabasha over Mississippi River | 5/2021 | 9/2021 | $3,790,000 | $3,790,000 | 6 | N/A |
60 | Replace curb at 3 roundabouts on Hwy 60 at the junctions of I-90 ramps, Oxford Street and CR35 in Worthington | 5/2021 | 8/2021 | $977,000 | $1,010,000 | 7 | mndot.gov/d7/projects/hwy60worthington-rab |
60 | Resurface east bound Hwy 60 from Hwy 15 to Blue Earth CR 20 | 5/2021 | 11/2021 | $3,416,000 | $3,666,000 | 7 | mndot.gov/d7/projects/hwy60madelia |
60 | Resurface Hwy 60 from Hwy 14 to Hwy 13 in Waterville; reconstruct in Madision Lake with improved sidewalks and crossings and improve approach slopes for safety; lighting at intersections | 3/2021 | 11/2021 | $23,574,000 | $23,574,000 | 7 | mndot.gov/d7/projects/hwy60madisonlake |
61 | Realign and replace the Silver Creek Bridge on Hwy 61 in Lake County | 9/2021 | 11/2023 | $1,000,000 | $7,080,000 | 1 | mndot.gov/d1/projects/hwy61-bridges |
61 | Replace signs along Hwy 61 between Grand Marais and Grand Portage Reservation boundary | 7/2021 | 11/2021 | $175,000 | $175,000 | 1 | N/A |
61 | Resurface and reconstruct Hwy 61 in Grand Marais in Cook County from 1.8 miles north of Cutface Creek to 0.1 miles south of CR 14 | 12/2019 | 10/2021 | $9,102,000 | $20,970,000 | 1 | mndot.gov/d1/projects/hwy-61-grand-marais |
61 | Resurface Highway 61 from Knife River to Scenic Drive in Lake County | 5/2021 | 11/2021 | $4,900,000 | $4,900,000 | 1 | mndot.gov/d1/projects/hwy61-twoharbors |
61 | Resurface Hwy 61 near Grand Portage from Reservation Bay Rd to US/Canadian border | 7/2020 | 11/2021 | $13,376,000 | $18,500,000 | 1 | mndot.gov/d1/projects/hwy61grandportage |
61 | Install active warning system on Hwy 61 near Lamoille | 7/2021 | 10/2021 | $460,000 | $460,000 | 6 | N/A |
61 | Repair drainage on Hwy 61 and CR B | 4/2021 | 6/2021 | $384,000 | $384,000 | Metro | N/A |
61 | Resurface Hwy 61 from 0.2 miles north of Hwy 8 in Forest Lake to 0.1 mile west of I-35 in Wyoming; install turn lane; add new signal at Fallbrook Ave; improve pedestrian crossings and sidewalks | 5/2021 | 8/2021 | $4,438,000 | $4,438,000 | Metro | mndot.gov/metro/projects/hwy61resurfacing |
62 | Landscape partnership with city of Edina along Hwy 62 between Ashcroft Ln and Wooddale Ave S. | 4/2021 | 6/2021 | $10,000 | $10,000 | Metro | N/A |
63 | Replace the Hwy 63 NB and SB bridges over I-90. Construct and expand interchange ramps and install cable median barrier | 5/2020 | 8/2021 | $6,969,000 | $17,600,000 | 6 | mndot.gov/d6/projects/hwy63-i90-interchange |
64 | Install larger culvert at Eleventh Crow Wing Lake on Hwy 64 north of Akeley | 8/2021 | 10/2021 | $860,000 | $1,250,000 | 2 | N/A |
65 | Resurface Hwy 65 from CR 8 to Hwy 71 near Littlefork | 7/2021 | 10/2021 | $3,600,000 | $3,600,000 | 1 | mndot.gov/d1/projects/hwy65littlefork |
65 | Construct reduced conflict intersection on Hwy 65 at Klondike Dr in East Bethel | 4/2021 | 8/2021 | $1,559,000 | $1,559,000 | Metro | mndot.gov/metro/projects/hwy65-klondike |
65 | Repair bridge on Hwy 65 at 3rd Ave S over Mississippi river in Mpls | 5/2020 | 6/2023 | $70,000,000 | $134,321,000 | Metro | mndot.gov/metro/projects/hwy65andthirdavebridge |
71 | Replace Hwy 71 bridges over Drayer Creek and Harris Creek in north/south ends of Browerville | 9/2021 | 10/2021 | $1,456,000 | $1,456,000 | 3 | mndot.gov/d3/projects/2021/h71 |
71 | Replace signal at Hwy 71/Sherman St in Jackson; improve sidewalk crossing | 5/2021 | 11/2021 | $390,000 | $390,000 | 7 | N/A |
71 | Construct a reduced conflict intersection at Hwy 71/CR 90 in Willmar; open median at 41st Ave to WB traffic; repair SB lanes from Point Lake to Hwy 71/Hwy 23 split; pave and open U-turn at CR 24; construct pedestrian crossing at CR 24 and 23rd St NE; extend left-turn lane at 23rd St | 5/2021 | 11/2021 | $1,630,000 | $1,630,000 | 8 | mndot.gov/d8/projects/us71cr90 |
71 | Replace bridge on Hwy 71 over the Cottonwood River south of Sanborn | 5/2021 | 11/2021 | $4,390,000 | $4,390,000 | 8 | mndot.gov/d8/projects/us71sanborn |
71 | Install gates and flashing lights at railroad crossing on Hwy 71 in Olivia | 7/2021 | 11/2021 | $255,000 | $255,000 | | N/A |
73 | Reconstruct, safety improvements on Hwy 210 and Hwy 73 in Cromwell in Carlton County | 8/2021 | 10/2022 | $3,329,000 | $3,600,000 | 1 | mndot.gov/d1/projects/hwy210cromwell |
73 | Resurface Hwy 27 from Hwy 65 to Aitkin/Carlton County Line | 7/2021 | 9/2021 | $6,623,000 | $6,623,000 | 1 | mndot.gov/d1/projects/hwy27 |
74 | Repair four bridges on Hwy 74 in Whitewater State Park | 2/2021 | 10/2021 | $4,300,000 | $4,300,000 | 6 | N/A |
75 | Resurface 22 miles of Hwy 75 from Twp Rd 127 to Hwy 7; upgrade sidewalks and ramps; replace culvert liners and guardrails; pave shoulders | 5/2021 | 11/2021 | $8,157,000 | $8,157,000 | 8 | mndot.gov/d8/projects/hwy75madisontobellingham |
76 | Repair 3 Hwy 76 bridges over Money Creek north of Houston | 8/2021 | 10/2021 | $50,000 | $50,000 | 6 | N/A |
77 | Repair bridges over Minnesota River on Hwy 77 in Bloomington | 5/2021 | 9/2021 | $2,286,000 | $2,286,000 | Metro | N/A |
84 | Construct Hwy 84 bridge over Norway Brook Dam in Pine River | 5/2021 | 9/2021 | $3,401,000 | $3,401,000 | 3 | mndot.gov/d3/projects/pineriver |
84 | Install center line mumble strips on Hwy 84 from Indian Trail Ln in Pine River to CR 7 in Longville | 7/2021 | 8/2021 | $416,000 | $416,000 | 3 | N/A |
87 | Resurface Hwy 87, widen shoulders and replace culverts from Frazee to the Becker/Wadena County Line | 11/2020 | 10/2021 | $13,705,000 | $13,705,000 | 4 | mndot.gov/d4/projects/frazee |
89 | Repair 4 bridges: Hwy 9 bridge over Marsh River south of Ada, Hwy 11 bridge over Silver Creek east of Baudette, Hwy 32 bridge south of Greenbush, Hwy 89 bridge over Roseau River northwest of Roseau | 5/2021 | 9/2021 | $2,011,000 | $2,011,000 | 2 | mndot.gov/d2/projects/bridges |
91 | Replace Hwy 91 bridge at junction with I-90 at Adrian | 4/2021 | 8/2021 | $1,957,455 | $2,730,000 | 7 | mndot.gov/d7/projects/hwy91bridge |
95 | Reconstruct 12 miles of Hwy 95 road surface from CR 15 west of Pine Brook to west of Cambridge; construct roundabout at Hwy 95/Hwy 47 | 7/2021 | 10/2021 | $8,837,000 | $8,837,000 | 3 | mndot.gov/d3/projects/2021/h95/ |
95 | Repair drainage on Hwy 95 from just north of Hwy 97 to just south of Hwy 8 in Scandia and Franconia Township | 8/2021 | 10/2021 | $297,000 | $297,000 | Metro | N/A |
95 | Resurface and repair drainage on Hwy 95 from Hudson Blvd to 0.25 miles north of Valley Creek Rd, and 0.23 miles south of Valley Creek Rd to 40th St/Bailey Rd in Woodbury | 7/2021 | 9/2021 | $3,028,000 | $3,028,000 | Metro | N/A |
99 | Resurface Hwy 99 from Birch St in Nicollet to Hwy 169 in St Peter; replace 1 bridge, 1 culvert, and lighting | 3/2021 | 8/2021 | $5,240,000 | $5,240,000 | 7 | mndot.gov/d7/projects/hwy99 |
100 | Repair bridge, pavement and drainage on Hwy 100; and ramps between I-694 and Hwy 252, I-694/I-94 in Brooklyn Center | 5/2021 | 8/2021 | $3,637,000 | $3,637,000 | Metro | N/A |
100 | Repair/relocate fence at various locations along Hwy 100 between Robbinsdale and Edina | 2/2021 | 8/2021 | $156,000 | $156,000 | Metro | N/A |
123 | Resurface Hwy 123, drainage improvements and pedestrian access improvements in Sandstone | 8/2021 | 10/2022 | $2,000,000 | $3,870,000 | 1 | mndot.gov/d1/projects/hwy123-sandstone |
135 | Hwy 135 In Biwabik, reconstruct pavement, new curb & gutter, utilities and accessibility improvements | 5/2020 | 9/2021 | $3,300,000 | $6,537,200 | 1 | mndot.gov/d1/projects/hwy135biwabik |
149 | Landscape on Hwy 149 from I-494 to Hwy 5 | 10/2019 | 6/2021 | $2,585 | $143,000 | Metro | mndot.gov/metro/projects/hwy149highbridge |
156 | Resurface Hwy 156; update ADA to to meet current accessibility standards; repair retaining wall along Hwy 156 from Annapolis St to Hwy 52 in St Paul; replace traffic signals at Hwy 156/Concord Ave and Hwy156/Hwy 52 in St Paul | 8/2021 | 7/2022 | $1,979,000 | $1,979,000 | Metro | N/A |
169 | Safety Improvements on Hwy 169 between Marble and Pengilly | 3/2021 | 11/2021 | $2,660,000 | $2,660,000 | 1 | mndot.gov/d1/projects/marble-pengilly |
169 | Resurface Hwy 169 from north of Winnebago to south side of Vernon Center | 8/2021 | 9/2021 | $4,450,000 | $4,610,000 | 7 | N/A |
169 | Repair eroded channel; install new drainage infrastructure and earth retention system at 0.7 miles south of 173rd St W on Hwy 169 in Jordan | 5/2021 | 6/2021 | $470,000 | $470,000 | Metro | N/A |
169 | Resurface and preventative maintenance on Hwy 169, Hwy 12, and Hwy 7 - in Metro District | 5/2018 | 6/2021 | $1,200,000 | $1,820,000 | Metro | N/A |
169 | Resurface, repair drainage, update ADA to to meet current accessibility standards on Hwy 47 from Pleasant St to Coolidge St in Anoka, and on Hwy 169 from the south end of the Mississippi River bridge to Clay St in Anoka | 7/2021 | 10/2021 | $2,181,000 | $2,181,000 | Metro | mndot.gov/metro/projects/hwy47-169-anoka |
172 | Resurface Hwy 172 and replace two culverts between Baudette and Wheeler's Point | 8/2020 | 6/2021 | $84,000 | $4,801,000 | 2 | mndot.gov/d2/projects/2020/hwy172-baudette |
200 | Resurface Hwy 200 between Hwy 371 and Hwy 84, and replace 2 culverts at Cedar Creek and Bag Creek | 5/2021 | 10/2021 | $10,770,000 | $10,770,000 | 2 | mndot.gov/d2/projects/2021/hwy200-walker |
200 | Resurface Hwy 200 from Mahnomen/Clearwater County line (Roy Lake) to Hwy 92 (Zerkel) | 7/2021 | 9/2021 | $4,180,000 | $4,180,000 | 2 | mndot.gov/d2/projects/hwy200-mahnomen-clearwater |
210 | Reconstruct, safety improvements on Hwy 210 and Hwy 73 in Cromwell in Carlton County | 8/2021 | 10/2022 | $3,329,000 | $3,600,000 | 1 | mndot.gov/d1/projects/hwy210cromwell |
210 | Replace Hwy 210 bridge over stream 4.4 miles west of Hwy 65 in McGregor | 7/2021 | 8/2021 | $317,000 | $317,000 | 1 | mndot.gov/d1/projects/hwy210-culvert |
210 | Reconstruct Hwy 210 from 2nd St SW to 3rd Ave NE in Crosby; resurface from west of 7th Ave in Ironton to 2nd St SW in Crosby, and upgrade pedestrian sidewalks | 4/2021 | 9/2021 | $7,145,000 | $7,145,000 | 3 | mndot.gov/d3/crosby-ironton |
210 | Smooth and repair 12 miles of concrete road surface and repair/replace pipes on Hwy 210 from east jct. Hwy 6 in Deerwood to 9th Ave W in Aitkin | 7/2021 | 10/2021 | $4,600,000 | $4,784,000 | 3 | mndot.gov/d3/projects/2021/h210 |
212 | Resurface Hwy 212; replace signals; improve pedestrian ramps; extend turn lanes; close access from 0.2 miles west of Hwy 25/Hwy 5 to CR 34 in Norwood Young America; extend turn lanes at Hwy 212, CR 131, CR 31, Railroad St and Salem Ave | 6/2020 | 6/2021 | $1,636,090 | $16,073,236 | Metro | N/A |
247 | Replace four culverts on Hwy 247 west of Plainview and repair multiple others on Hwy 247 and one on Hwy 63 near Wabasha CR 7 | 4/2021 | 6/2021 | $1,950,000 | $1,950,000 | 6 | N/A |
250 | Resurface Hwy 250 from Hwy 16 to Hwy 30 | 7/2021 | 9/2021 | $3,540,000 | $3,540,000 | 6 | mndot.gov/d6/projects/hwy250-paving-culvert-replacement |
271 | Resurface Hwy 271 from Hwy 19 to South Dakota border, excluding the town of Hendricks | 9/2021 | 11/2021 | $2,100,000 | $2,100,000 | 8 | mndot.gov/d8/projects/hwy271hendricks |
282 | Reconstruct and resurface 6.7 miles of Hwy 282 between Jordan and Spring Lake Township; repair drainage, signing, sidewalk/trail; update ADA to to meet current accessibility standards; construct retaining wall | 5/2021 | 10/2021 | $6,218,000 | $6,218,000 | Metro | mndot.gov/metro/projects/hwy21-282-jordan |
316 | Reconstruct Hwy 316 from south of Tuttle Dr to Hwy 61 in Dakota County; construct three roundabouts | 5/2021 | 11/2021 | $ 5,900,000 | $ 5,900,000 | Metro | mndot.gov/metro/projects/hwy316 |
317 | Paint Hwy 317 bridge over the Red River of the North located west Hwy 220. | 7/2021 | 10/2021 | $345,000 | $345,000 | 2 | N/A |
610 | Replace signals; update ADA to to meet current accessibility standards on Hwy 610 at CR 3/Coon Rapids Blvd south ramp in Coon Rapids | 7/2021 | 9/2021 | $300,000 | $300,000 | Metro | N/A |
11 | Reconstruct Hwy 53 from Crescent Dr to 4th St, and Hwy 11 from Hwy 71 to Hwy 53 in International Falls | 7/2020 | 10/2021 | $13,307,000 | $18,500,000 | 1 | mndot.gov/d1/projects/hwy-53-international-falls |
12 | Improve intersection on Hwy 12 east and west of CR 92 jct in Independence; improve railroad crossing on Hwy 12 at CR 92 and on Valley Rd in Independence | 5/2021 | 11/2021 | $4,813,000 | $4,813,000 | Metro | mndot.gov/metro/projects/hwy12-orono-independence |
2B | Replace sidewalk, pedestrian accessibility improvements and resurfacing on Hwy 2B/Demers Ave in East Grand Forks between the Sorlie Bridge and Fourth St NW, and on Fourth St NW between Hwy 2B/Demers Ave and Third Ave NW | 5/2021 | 10/2021 | $303,000 | $303,000 | 2 | N/A |
I 35 | Fiber optic cable installation on I-35 from Hwy 33, to Thompson Hill Visitor Center in Duluth | 7/2021 | 10/2021 | $602,000 | $602,000 | 1 | N/A |
I 35 | I-35 Thompson Hill Rest Area in Duluth - parking lot and ADA improvements | 4/2021 | 11/2021 | $3,700,000 | $3,700,000 | 1 | N/A |
I 35 | Install cable median safety barrier on I-35 from Beroun to Scanlon | 5/2021 | 7/2021 | $1,850,000 | $1,850,000 | 1 | N/A |
I 35 | Pavement overlay on I-35 in Proctor from Boundary Ave to Central Ave | 7/2021 | 10/2021 | $1,850,000 | $1,850,000 | 1 | N/A |
I 35 | Repair drainage structures on I-35 In Duluth | 8/2021 | 10/2021 | $530,000 | $530,000 | 1 | N/A |
I 35 | Twin Ports Interchange construction and bridge replacement at I-35, I-535 and Hwy 53 in Duluth | 10/2020 | 11/2023 | $127,000,000 | $275,840,000 | 1 | mndot.gov/d1/projects/twin-ports-interchange |
I 35 | Upgrade fiber optic cable and traffic cameras on I-35 in Duluth | 2/2021 | 8/2021 | $520,000 | $520,000 | 1 | N/A |
I 35E | Install cable median guardrail on I-35 from north of I-35E/35W split to 0.2 miles south of Hwy 97 in Columbus | 7/2021 | 8/2021 | $302,000 | $302,000 | Metro | N/A |
I 35E | Landscape on I-35E from north intersection at Wheelock Pkwy in St Paul to Little Canada Rd in Little Canada | 7/2020 | 6/2021 | $94,000 | $94,000 | Metro | N/A |
I 35E | Landscape on I-35E from University Ave to southern intersection at Wheelock Pkwy in St Paul | 7/2020 | 6/2021 | $94,000 | $94,000 | Metro | N/A |
I 35E | Repair concrete pavement and bridges on I-94 from 0.2 miles west of Western Ave to 0.1 miles east of Mounds Blvd in St Paul, and on I-35E from 0.3 miles north of the 10th St bridge to University Ave | 7/2021 | 11/2022 | $9,000,000 | $32,430,000 | Metro | mndot.gov/metro/projects/i94-i35e-stpaul |
I 35E | Replace lighting at Diffley Rd in Burnsville to Lone Oak Rd in Eagan | 9/2021 | 3/2022 | $515,000 | $515,000 | Metro | N/A |
I 35E | Replace signal system; update ADA to to meet current accessibility standards on I-35E at CR 32/Cliff Rd in Eagan | 4/2021 | 7/2021 | $706,000 | $706,000 | Metro | N/A |
I 35E | Replace signs on I-35E from South I-35E/I-35W Jct in Burnsville to Deerwood Dr in Eagan | 4/2021 | 6/2021 | $383,000 | $383,000 | Metro | N/A |
I 35W | Construct MnPASS lane; reconstruct road; construct transit station, noise walls, retaining walls; build 6 bridges; replace 13 bridges and repair 3 bridges on I-35W in Mpls from 43rd St to 11th Ave, and on I-94 from 1st Ave to Park Ave | 8/2017 | 10/2021 | $30,000,000 | $203,700,000 | Metro | mndot.gov/35w94 |
I 35W | Construct MnPASS lane; resurface road; repair 17 bridges; replace 5 bridges on I-35W from CR B2 in Roseville to 0.1 mile north of Sunset Ave in Lino Lakes, and on Hwy 10 from Jct with I-35W to 0.7 miles east of County Rd J | 4/2019 | 9/2021 | $38,173,000 | $200,675,000 | Metro | mndot.gov/metro/projects/35wnorthmnpass |
I 35W | Construct stormwater holding cavern system on NB I-35W from 42nd St to 0.1 mile south of 40th St in Mpls | 12/2019 | 8/2023 | $25,000,000 | $66,000,000 | Metro | N/A |
I 35W | Landscape from 31st St to 43rd Ave in Mpls | 10/2021 | 9/2022 | $1,000,000 | $1,000,000 | Metro | N/A |
I 35W | Repair bridge on I-35W over the Mississippi River in Mpls | 5/2021 | 7/2021 | $994,000 | $994,000 | Metro | N/A |
I 35W | Replace bridge on I-35W over Minnesota River from Black Dog Rd in Burnsville to 106th St in Bloomington | 6/2018 | 9/2021 | $1,850,000 | $115,160,000 | Metro | mndot.gov/metro/projects/i35wbloomington |
I 394 | Restripe I-394, Hwy 62, Park Ave and Portland Ave | 4/2018 | 6/2022 | $200,000 | $665,000 | Metro | N/A |
I 494 | Demolish building (BP gas station) at Portland Ave and I-494 | 5/2021 | 6/2021 | $300,000 | $300,000 | Metro | N/A |
I 494 | Landscape along I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road | 8/2021 | 11/2023 | $150,000 | $208,000 | Metro | N/A |
I 535 | Twin Ports Interchange construction and bridge replacement at I-35, I-535 and Hwy 53 in Duluth | 10/2020 | 11/2023 | $127,000,000 | $275,840,000 | 1 | mndot.gov/d1/projects/twin-ports-interchange |
I 694 | Install lighting on I-694 from 10th St N in Oakdale to Hwy 61 in Vadnais Heights/White Bear Lake | 8/2020 | 5/2021 | $1,022,000 | $1,759,000 | Metro | N/A |
I 694 | Landscape along I-694 from 10th Street to I-694/494/94 junction and on I-494 from I-694/494/94 junction to Tamarack Road | 8/2021 | 11/2023 | $150,000 | $208,000 | Metro | N/A |
I 694 | Revise signal; construct pedestrian trail at I-694 and CR 14 in Oakdale | 5/2021 | 6/2021 | $702,500 | $702,500 | Metro | N/A |
I 90 | Install cable median barrier on I-90 from Hwy 13 to I-35 | 10/2021 | 11/2021 | $810,000 | $810,000 | 6 | N/A |
I 90 | Install cable median barrier on I-90 from Hwy 52 to Hwy 42 | 4/2021 | 6/2021 | $950,000 | $950,000 | 6 | N/A |
I 90 | Replace 28th St NE bridge over I-90 in Austin | 4/2021 | 10/2021 | $4,370,000 | $4,370,000 | 6 | mndot.gov/d6/projects/i90-austin-bridge-replacements |
I 90 | Replace the Hwy 63 NB and SB bridges over I-90. Construct and expand interchange ramps and install cable median barrier | 5/2020 | 8/2021 | $6,969,000 | $17,600,000 | 6 | mndot.gov/d6/projects/hwy63-i90-interchange |
I 90 | Pave parking area at I-90 eastbound rest area west of Jackson (Clear Lake) and at the I-90 westbound rest area (Des Moines); improve pedestrian crossings and lighting | 7/2021 | 11/2021 | $4,133,000 | $4,133,000 | 7 | N/A |
I 90 | Resurface eastbound I-90 from Jackson CR 5 to Hwy 86 | 4/2021 | 10/2021 | $12,210,000 | $12,210,000 | 7 | N/A |
CR 92 | Improve intersection on Hwy 12 east and west of CR 92 jct in Independence; improve railroad crossing on Hwy 12 at CR 92 and on Valley Rd in Independence | 5/2021 | 11/2021 | $4,813,000 | $4,813,000 | Metro | mndot.gov/metro/projects/hwy12-orono-independence |
I 94 | Reconstruct I-94 and add lane from west of Hwy 25 in Monticello to Hwy 24 in Clearwater; includes noise barriers | 8/2019 | 8/2022 | $85,068,000 | $99,918,000 | 3 | mndot.gov/i94-mg-clearwater |
I 94 | Reconstruct I-94 and add lane from Wright CR 19 in Albertville to the Crow River bridge in St. Michael, includes bridges at Wright CR 19 and Hwy 241 | 7/2019 | 11/2021 | $36,577,000 | $66,165,000 | 3 | mndot.gov/i94-mg-clearwater |
I 94 | Construct noisewall along I-94 from Prior Ave to Fairview Ave in St Paul | 8/2021 | 10/2021 | $931,000 | $931,000 | Metro | mndot.gov/metro/projects/standalonenoisebarrier/i94stpaul.html |
I 94 | Improve accessibility to meet ADA standards off I-94 near Cleveland Ave and Prior Ave in St Paul | 4/2021 | 5/2021 | $65,000 | $65,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 near Cretin Ave in St Paul | 4/2021 | 5/2021 | $47,000 | $47,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on Concordia Ave from Asbury St to Pascal St in St Paul | 4/2021 | 5/2021 | $96,000 | $96,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on Concordia Ave near Dale St in St Paul | 4/2021 | 5/2021 | $59,000 | $59,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on Concordia Ave near Lexington Ave in St Paul | 4/2021 | 5/2021 | $73,000 | $73,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on Concordia Ave near Snelling Ave in St Paul | 4/2021 | 5/2021 | $58,000 | $58,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on St Anthony Ave near Dale St in St Paul | 4/2021 | 5/2021 | $40,000 | $40,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on St Anthony Ave near Kent St in St Paul | 4/2021 | 5/2021 | $36,000 | $36,000 | Metro | N/A |
I 94 | Improve accessibility to meet ADA standards off I-94 on St Anthony Ave near Lexington Ave in St Paul | 4/2021 | 5/2021 | $44,000 | $44,000 | Metro | N/A |
I 94 | Improve I-94 between Maple Grove and Rogers. Reconstruct EB and WB I-94 between Hwy 610 and Hwy 101; improve rest area parking lot, weigh in motion, ADA and lighting from Hwy 101 in Rogers to I-494 Jct in Maple Grove | 12/2019 | 11/2021 | $79,959,000 | $128,500,000 | Metro | mndot.gov/i94-mg-clearwater |
I 94 | Landscape EB I-94 rom Prior Ave to Fairview Ave in St Paul. | 8/2021 | 11/2023 | $56,000 | $56,000 | Metro | N/A |
I 94 | Landscape I-94 from Pascal St to Mackubin Ave in St Paul | 8/2021 | 6/2022 | $192,000 | $192,000 | Metro | N/A |
I 94 | Repair bridges on Hwy 952A from EB I-94 to N 4th St, I-94 ramp to N 3rd St to WB I-94, and I-394 off ramp from 0.03 miles southwest of N 4th St in Mpls | 4/2021 | 7/2021 | $4,703,000 | $4,703,000 | Metro | N/A |
I 94 | Repair St Croix Weigh Station in Lakeland | 4/2020 | 7/2021 | $570,000 | $780,900 | Metro | N/A |
I 94 | Resurface road; install cable median barrier; update ADA to to meet current accessibility standards on I-94/694 from Brooklyn Blvd to 0.1 mile east of Dupont Ave in Brooklyn Center | 3/2021 | 6/2021 | $5,651,600 | $5,651,600 | Metro | N/A |
I 94 | Upgrade sidewalks, pedestrian ramps and audible pedestrian signals at frontage roads along I-94 from Cretin Ave to Griggs St in St Paul | 6/2021 | 8/2021 | $1,846,000 | $1,846,000 | Metro | mndot.gov/metro/projects/i94stpaul-ada |
I 90 | Resurface I-90 from just east of South Dakota to Luverne on WB lanes; repair one bridge | 7/2021 | 9/2021 | $4,900,000 | $5,300,000 | 7 | N/A |
I 94 | Repair concrete pavement and bridges on I-94 from 0.2 miles west of Western Ave to 0.1 miles east of Mounds Blvd in St Paul, and on I-35E from 0.3 miles north of the 10th St bridge to University Ave | 7/2021 | 11/2022 | $9,000,000 | $32,430,000 | Metro | mndot.gov/metro/projects/i94-i35e-stpaul |
Old Hwy 19 | Remove bridge on Old Hwy 19 over Sulphur Lake, 4 miles SW of Morton | 9/2021 | 11/2021 | $980,000 | $980,000 | 8 | mndot.gov/d8/projects/sulphurlake |
Various | Districtwide highway lighting improvements - MnDOT District 1 | 7/2021 | 11/2021 | $99,000 | $550,000 | 1 | N/A |
Various | Districtwide pavement rehabilitation - MnDOT District 1 | 5/2021 | 10/2021 | $3,500,000 | $3,500,000 | 1 | N/A |
Various | Install new lighting at various locations in District 2 | 6/2021 | 8/2021 | $468,000 | $468,000 | 2 | N/A |
Various | Districtwide culvert repairs - District 4 | 7/2021 | 11/2021 | $700,000 | $700,000 | 4 | N/A |
Various | Districtwide safety improvements - District 4 | 5/2021 | 7/2021 | $338,200 | $338,200 | 4 | N/A |
Various | Fill cracks with seal coating at various locations in District 6 | 5/2020 | 2/2022 | $220,000 | $220,000 | 6 | N/A |
Various | Install rumble strips at various locations in District 6 | 5/2021 | 7/2021 | $700,000 | $700,000 | 6 | N/A |
Various | Paint pavement markings districtwide at various locations in District 6 | 5/2020 | 12/2021 | $2,000 | $520,000 | 6 | N/A |
Various | Improve intersection signing and lighting at 17 intersections in District 7 | 4/2021 | 10/2021 | $269,421 | $269,000 | 7 | N/A |
Various | Install intersection lighting on Hwy 14, and Hwy 13, at 3 county roads in Waseca County | 4/2021 | 10/2021 | $52,000 | $59,000 | 7 | N/A |
Various | Install riprap to repair minor erosion along slopes of several highways and bridges in District 7 | 8/2021 | 11/2021 | $810,000 | $810,000 | 7 | N/A |
Various | Replace pavement messages in District 7 | 5/2021 | 10/2021 | $533,000 | $1,166,000 | 7 | N/A |
Various | Replace requestor pay signs in District 7 | 4/2021 | 10/2021 | $317,000 | $317,000 | 7 | N/A |
Various | Replace signs in District 7 | 11/2020 | 5/2021 | $804,000 | $804,000 | 7 | N/A |
Various | Install delineator posts on multiple hwys in District 8 | 7/2021 | 11/2021 | $94,000 | $94,000 | 8 | N/A |
Various | Install permanent message boards on multiple hwys in District 8 | 5/2021 | 11/2021 | $134,000 | $134,000 | 8 | N/A |
Various | Replace permanent pavement markings on multiple hwys in District 8 | 5/2021 | 11/2021 | $100,000 | $100,000 | 8 | N/A |
Various | Update sidewalks, ramps and driveways to meet ADA standards in Canby, Clara City, Litchfield, Tyler and Willmar | 5/2021 | 11/2021 | $1,550,000 | $1,550,000 | 8 | mndot.gov/d8/projects/adaprojects |
Various | Flood seal various bridges in Metro District | 6/2021 | 12/2022 | $300,000 | $600,000 | Metro | N/A |
Various | Remove rodent tree guards at various locations in Metro District | 9/2020 | 11/2022 | $50,000 | $50,000 | Metro | N/A |
Various | Repair concrete pavement in Metro District | 4/2020 | 10/2021 | $300,000 | $1,451,000 | Metro | N/A |
Various | Replace dynamic message signs in Metro District | 11/2020 | 5/2021 | $692,000 | $692,000 | Metro | N/A |
Various | Replace metrowide MnPASS signs with E-ZPass signs; fill in the MnPASS gap on NB I-35E | 6/2021 | 8/2021 | $1,370,000 | $1,370,000 | Metro | N/A |
Various | Replace shelters, cameras and cables in Metro District | 9/2020 | 5/2021 | $20,000 | $923,000 | Metro | N/A |
Various | Replace traffic detector loops in Metro District | 5/2021 | 6/2021 | $75,000 | $75,000 | Metro | N/A |
Various | Replace traffic signal loops in Metro District | 7/2020 | 7/2022 | $150,000 | $150,000 | Metro | N/A |
Various | Restore and clean ponds in Metro District | 11/2020 | 6/2021 | $800,000 | $800,000 | Metro | N/A |